Specification limits
Outer allowable interval around nominal.
Unit Converters
Produce an Accept, Review, or Reject point decision while keeping analytical recovery suitability distinct from specification conformance.
Conformity with method gate
Evaluate one measured concentration against asymmetric specification limits with an explicit gU guard. An independent recovery window can hold the final decision for review when the analytical method is not valid for this result.
| Boundary or gate | Value | Role | Decision meaning |
|---|
How to use
Evaluate one measured concentration against asymmetric specification limits with an explicit gU guard. An independent recovery window can hold the final decision for review when the analytical method is not valid for this result.
Outer allowable interval around nominal.
gU moved inward from each specification limit.
Point lies inside the guarded interval and recovery gate is valid.
Point lies in a guard band or method recovery is outside its window.
Point lies beyond an outer specification limit when the method gate is valid.
Result interpretation
The numerical point verdict answers where the measured value lies. The final verdict also asks whether method recovery is acceptable. A failed recovery gate produces Review; it does not silently correct the concentration or transform a reject into acceptance.
Calculation method
Calculate asymmetric limits from nominal. Multiply expanded uncertainty U by guard factor g and shrink both sides to form the acceptance interval. Apply the three-state point rule, then apply the recovery window as an independent validity gate.
Evidence controls
Confirm specification revision, uncertainty basis, coverage, guard multiplier, and boundary convention before use.
Nominal and measured values must refer to the same analyte, denominator, dilution state, and unit.
Use recovery from an appropriate spike, reference material, or control for the same method and matrix.
This calculator uses a point with guarded limits; it does not require the entire uncertainty interval inside specification.
Equality at guarded acceptance limits is accepted; equality at outer limits remains inside the review or rejection logic as calculated.
Expanded uncertainty should already reflect justified method components and coverage.
Risk-based or probabilistic rules may be required instead of a fixed guard.
Visual explanation
The pale corridor is specification; the inner green corridor is guarded acceptance. The measured marker shows numerical position, while the recovery annotation controls whether that numerical result is decision-valid.
Detailed calculation process
LSL = nominal(1 − tlower); USL = nominal(1 + tupper); acceptance = [LSL + gU, USL − gU]
| Symbol | Meaning | Required unit |
|---|---|---|
| nominal | target concentration | declared concentration unit |
| tlower, tupper | asymmetric tolerances | fraction or % |
| U | expanded measurement uncertainty | same unit as concentration |
| g | guard multiplier | dimensionless |
| LSL, USL | outer specification limits | concentration unit |
| recovery | method-control recovery | % |
Reconciliation:Waiting for current inputs.
Defaults and assumptions
Defaults illustrate a nominal 100 with −5%/+8% tolerances, U = 1.2, g = 1, and an approved 90–110% recovery window. They are not universal compliance limits.
| Check | Current value A | Current value B | Decision role |
|---|
Decision analysis
Use Accept, Review, or Reject only under the declared rule and recovery evidence. A Review should route to an authorized action such as reconditioning, reanalysis, investigation, or risk review.
Confirm whether uncertainty is expanded or standard; multiplying the wrong quantity by g changes the guard. Do not apply recovery twice by correcting the measured value and also using the recovery gate unless the method explicitly requires both. A recovery outside range may indicate matrix effects, preparation loss, contamination, calibration trouble, or an unsuitable control. Investigate cause rather than treating Review as a softer Reject. Record the unrounded distances to both outer and guarded limits for boundary cases.
Verification workflow
Record the specification owner, revision, nominal basis, asymmetric limits, boundary equality convention, uncertainty definition, guard multiplier, and recovery window before seeing the sample result. A legal, contractual, internal process, and laboratory control rule can differ even when their numeric limits look similar. Verify whether the rule applies to an individual result, a reportable mean, or a lot statistic. Do not choose g after calculating which value would produce acceptance.
Determine whether the entered quantity is expanded uncertainty U, standard uncertainty u, or an interval from another method. Record coverage factor or probability and the concentration level to which it applies. If uncertainty changes with concentration, use the value relevant to the measured result. Confirm units after dilution restoration and do not combine relative and absolute uncertainty without conversion. Shared calibration and preparation components may be correlated and require a controlled uncertainty budget upstream.
Use a control that is relevant to analyte, matrix, preparation, concentration, and batch. A spike may monitor extraction plus matrix effects, while a neat standard can monitor only calibration response. Confirm whether the approved range is inclusive and whether recovery is corrected for native analyte. An out-of-range recovery creates a method-validity hold here; the authorized laboratory procedure determines rerun, dilution, alternate method, investigation, or qualification.
A point in the guard band has different implications from a centered point with failed recovery, even though both show Review. Preserve the numerical point verdict and gate state separately. Examine unrounded distances to specification and acceptance boundaries, source uncertainty, calibration, dilution, sample homogeneity, and control results. Do not describe Review as “almost pass” or “automatic fail.” Route it to the named decision authority with enough evidence to choose the next action.
A valid report identifies the measured quantity, result and unit, uncertainty and coverage, specification, decision rule, recovery-control result, boundary convention, and final authorized disposition. The calculator’s PDF provides the arithmetic trail but does not sign the conformity statement. If a repeat result is obtained, preserve the original and state whether the procedure permits replacement, averaging, or selection. Audit that no one applied recovery or dilution twice between the instrument, LIMS, calculator, and certificate.
Evidence and data lineage
Retain specification version, nominal basis, uncertainty budget and coverage, guard rule, boundary convention, method, matrix, recovery control identity, acceptance window, raw result, dilution, analyst, and final disposition authority.
Limits and exclusions
The page does not select a legal decision rule, estimate consumer or producer risk, correct recovery, calculate uncertainty, handle one-sided limits, or override method-control procedures.
Reference framework
JCGM 106 addresses conformity assessment with measurement uncertainty and explains that decision rules control the balance of incorrect-acceptance and incorrect-rejection risk. The GUM provides the broader uncertainty framework, and the International Vocabulary of Metrology distinguishes measurement result, uncertainty, and metrological traceability. This calculator implements one transparent fixed-guard, three-state point rule rather than claiming universal compliance. The applicable specification, contract, regulation, laboratory procedure, and recovery-control method remain authoritative. Record the source and revision of each limit and the meaning of U and g; otherwise a correct calculation can still produce an unauthorized conformity statement.
Worked decision cases
A point inside specification but outside guarded acceptance is routed to Review.
The numerical result may be centered, yet final verdict remains Review because method validity failed.
Important note
Never use the recovery gate as a hidden correction or let a numerical Accept override invalid analytical performance.
The point verdict describes concentration position; the final verdict also includes recovery validity.
Not in this rule. gU is applied to specification limits.
Some concentration requirements permit different low and high deviations.
Yes. Excessive uncertainty or guard width makes acceptance impossible, and the calculator rejects that setup.
No. It means the declared rule cannot support a direct acceptance or rejection.
Only if the governing method authorizes a correction. This calculator treats recovery as a gate.
The inclusive window treats it as valid.
Yes only when zero is genuinely the authorized input; it should not be used to hide missing uncertainty.
No. It must come from the chosen decision rule.
Only after confirming the legal text, units, basis, and mandated decision rule.