Estimate concrete for a rectangular slab or footing using metric dimensions. Review base and order volume, wet weight, ready-mix loads, bag estimates, scenario depths, and export a professional PDF.

Base concrete volume0 m3
Recommended order volume0 m3
Approximate wet weight0 kg
Approximate 25 kg bags0

Depth sensitivity

Volume at alternative slab depths

Order volume by thicknessIncludes current waste allowance
ThicknessBase volumeOrder volumeWet weight20 kg bags25 kg bags
Slab view

Concrete slab footprint, depth, waste, and order volume

Footprint, depth, base volume, and ordering margin are shown as a buildable slab estimate.

Concrete slab footprint, depth, waste, and order volume
Footprint
Depth
Base volume0
Order volume0
Weight0
Bag count0

How to use Concrete Calculator

  1. Enter slab length, width, depth, and waste allowance using consistent units.
  2. Review base volume separately from order volume so waste and placement margin are visible.
  3. Use the slab cross-section visual and scenario table to judge whether a change in depth has a meaningful order impact.

Calculator guide

Understanding Concrete Calculator

Concrete ordering starts with geometric volume and then adds an allowance for grade variation, spillage, and placement loss. Bag estimates depend on product yield, not bag weight alone.

Base volume Length multiplied by width and converted thickness.
Order volume Base volume increased by the selected allowance.
Wet weight Approximate mass using a typical concrete density.
Bag estimate Order volume divided by representative premix bag yield.

Calculation method

How the calculation works

Rectangular concrete volume = length x width x thickness, converted to cubic meters and increased by the waste allowance. Convert millimeter thickness to meters, multiply dimensions for cubic meters, apply waste, then convert using approximate density and bag-yield assumptions.

Concrete volume method

The mathematical slab volume before waste is added.
Base volume plus the entered waste allowance.
A planning number based on typical concrete density.
A rounded material count when bagged concrete is used instead of ready-mix.

Before ordering concrete

Small depth changes can materially change ordered volume.
Confirm whether the supplier quotes cubic yards, cubic meters, or bags.

Worked situations

Practical examples

  • Estimate a 4 m by 6 m slab at 100 mm thickness.
  • Add a practical waste allowance for uneven grade and handling loss.
  • Compare 20 kg, 25 kg, and 40 kg premix bag estimates.

Better inputs

Useful tips

  • Measure several depths when the subgrade is uneven.
  • Confirm truck minimums and bag yields with the supplier.
  • Plan access, labor, and placement before concrete arrives.

Before relying on the result

Limitations and common mistakes

  • Only rectangular slabs or footings are modeled.
  • Density and premix yield vary by product and mix design.
  • Structural sizing and reinforcement require qualified design.

Reference

Key terms

Volume
Three-dimensional quantity expressed here in cubic meters.
Thickness
Slab depth converted from millimeters to meters.
Yield
Wet concrete volume produced by one bag.
Waste
Extra order volume for site variation and loss.

Important note

Calculated from the entered measurements and stated coverage or quantity rules. Confirm field dimensions, waste, product requirements, structural conditions, and local codes before purchasing or building.

Frequently asked questions

How is slab volume calculated?

Multiply length by width by thickness after converting thickness to meters.

Why add waste?

Actual forms and subgrades are imperfect, and placement can involve loss.

Are bag estimates exact?

No. Check the manufacturer's stated yield for the specific product.

Does this design slab thickness?

No. Structural dimensions should come from applicable plans or qualified advice.