Halfway expansion
A 51% result with positive headroom supports scheduled continuation, provided the next release remains funded and commissioned on time.
Education
Measure delivered usable seats against the baseline-to-target expansion plan. Progress is the completed increase above baseline divided by the planned increase. Current enrollment remains a separate headroom check, so completion cannot hide an active shortfall.
CAPACITY BUILD PROGRESS
Measure delivered usable seats against the baseline-to-target expansion plan. Progress is the completed increase above baseline divided by the planned increase. Current enrollment remains a separate headroom check, so completion cannot hide an active shortfall.
LIVE CAPACITY / SCORE VISUAL
Measure delivered usable seats against the baseline-to-target expansion plan. Progress is the completed increase above baseline divided by the planned increase. Current enrollment remains a separate headroom check, so completion cannot hide an active shortfall. The visual updates from the same validated calculation record; it is an interpretation aid, not a policy or compliance ruling.

| Milestone | Seats | Change from baseline | Share of plan | Interpretation |
|---|
How to use
Progress fundamentals
Calculation method
The page subtracts baseline from target to establish the planned increase. It subtracts baseline from completed seats to establish delivered increase, then divides the two. A plan with no increase has a defined 100% endpoint only when completed equals target; there is no hidden division by zero.
Completion versus readiness
Progress is about the build plan. Headroom is about today’s enrollment. If enrollment grew faster than delivery, the plan may be far along while still needing immediate action.
Evidence timing
Do not mix a signed-off room with a room still waiting for furniture, access, or safety review. The completed input should be a consistent operational state.
Decision boundary
Percentage alone hides scale. A 90% complete plan can still leave a large shortfall if the target is large; always retain the absolute seats remaining.
Detailed calculation process
The current milestone values above provide the final reconciliation.
Result interpretation
Progress is zero at baseline and reaches 100% at target. Remaining seats are always shown as an absolute quantity. Negative headroom means enrollment is above completed usable seats and should be treated as an active shortfall.
Planning response
When remaining seats are concentrated in a later phase, the schedule and commissioning evidence matter more than a rounded percentage. Pair the result with the delivery date and dependency record.
Limits and exclusions
Key terminology
Worked decision cases
A 51% result with positive headroom supports scheduled continuation, provided the next release remains funded and commissioned on time.
An 80% build can still show negative headroom when enrollment outpaced delivery. Treat the shortfall as urgent even though the project is near its target.
Authoritative basis
This is a progress ledger, not a certification of construction, commissioning, or service quality. Keep acceptance evidence beside the number.
The page measures the increase above a declared baseline.
Yes; that is 0% progress when a positive increase is planned.
Completion is 100% only when completed also equals target.
It supplies a separate present-headroom check.
No; dates and dependencies need a separate schedule record.