Hours are not units
A long research chapter and a short exercise set can consume different time. The separate cards prevent the blend from implying equivalence.
Education
Blend completed study hours and completed learning units into a documented completion percentage with remaining work visible.
STUDY TIME COMPLETION
A study plan can consume hours while leaving units unfinished, or finish units with less time than expected. This calculator keeps both completion lenses and their declared blend visible.
LIVE DECISION VISUAL
Use the two component rates to decide whether the next action is protecting time, closing unfinished units, or revisiting the weighting rule.

Enter valid values to populate the chart.
| Progress lens | Completed | Planned | Rate | Weight | Interpretation |
|---|
LIVE CALCULATION PROCESS
time rate = completed hours ÷ planned hours; unit rate = completed units ÷ planned units; completion = time rate × time weight + unit rate × unit weight
HOW TO USE
SUBJECT FUNDAMENTALS
CALCULATION METHOD
With defaults, T = 10 ÷ 24 = 41.67%, U = 5 ÷ 12 = 41.67%, and C = 41.67%×60% + 41.67%×40% = 41.67%. The remaining ledger is 14 hours and 7 units; both denominators reconcile independently.
DEEP ANALYSIS
A long research chapter and a short exercise set can consume different time. The separate cards prevent the blend from implying equivalence.
A 60/40 blend is a chosen planning rule. Changing it can change the headline without changing any study record.
Finishing a unit says that the scope was covered. Recall, explanation, and application require separate evidence.
RESULT INTERPRETATION
At 100%, both denominators are complete under the entered definitions. At 0%, no counted work is complete. A middle result should be read with the two component rates, the remaining workload, and the weight policy—not as a grade.
The live chart shows plan and completed amounts for both lenses. A visually balanced pair of bars can still represent very different units, so keep their labels visible.
EVIDENCE AND DATA LINEAGE
Keep the assignment brief, unit list, time log, and date range together. If units are redefined after work starts, record a new calculation rather than silently changing the denominator.
LIMITS AND EXCLUSIONS
TECHNICAL GLOSSARY
WORKED DECISION CASES
A reader may log many hours on one difficult chapter while the unit rate remains low. The two cards support a scope decision without calling the effort inefficient.
A fast preview can close many units with few hours. The next action may be retrieval or review rather than more page coverage.
IMPORTANT NOTE
If the plan never defined a time-versus-unit policy, report both rates and treat the weighted completion as exploratory.
FREQUENTLY ASKED QUESTIONS
No. This page treats the entered plan as its denominator; create a new plan or revise the scope rather than hiding overrun.
Time and scope answer different questions. The page keeps both so a long difficult unit does not disappear from the record.
Both completed hours and completed units must equal their planned totals under the entered definitions.
Yes. A zero time weight makes the summary equal to unit completion; the time rate remains visible.
No. It is a completion index based on workload and scope, not a validated learning outcome.