Foundation Concrete Coverage Calculator
Calculate plan area, uniform slab volume, thickened-edge volume, base concrete, waste allowance, order volume, truckloads, and coverage comparison.
Decision view
Foundation plan, section, and concrete fill
| Slab thickness (m) | Foundation plan area | Uniform slab volume | Additional thickened-edge volume | Base concrete volume | Entered waste allowance | Concrete order volume | Whole truckload reference | Plan area per ordered cubic metre | Plan area minus entered comparison |
|---|
How to use Foundation Concrete Coverage Calculator
- Enter foundation length, width, and slab thickness.
- Enter thickened-edge length and additional cross-section.
- Enter waste percentage and truck capacity.
- Review the plan, section, and quantity decomposition.
Calculator guide
Understanding Foundation Concrete Coverage Calculator
Foundation concrete quantity combines plan area, slab thickness, and additional thickened-edge cross-section. Waste and truck capacity should be added only after geometric volume is reconciled.
Calculation method
How the calculation works
Detailed calculation process
Reconcile foundation geometry into an order quantity
The default foundation is 18 m by 10 m with a 0.15 m slab, 56 m of thickened edge adding 0.08 m² per metre, 7% waste, and 8 m³ trucks.
What each symbol means
Worked substitution with the default inputs
The default geometry requires 31.48 m³ before waste and 33.6836 m³ for ordering, equivalent to five 8 m³ truck-capacity references.
Construction geometry
See footprint, slab section, and truck fill together
A plan view shows dimensions, a section distinguishes uniform slab from thickened edge, and a fill gauge reconciles ordered volume against truck capacity.
Worked situations
Practical examples
- The footprint is 180 m².
- The slab uses 27 m³ and thickened edge adds 4.48 m³.
- Seven percent waste brings the order to 33.6836 m³.
Better inputs
Useful tips
- Use only the edge area beyond the uniform slab section.
- Confirm dimensions from structural drawings.
- Coordinate partial-load and delivery constraints with the supplier.
Before relying on the result
Limitations and common mistakes
- Beams, piers, steps, overbreak, pumping loss, reinforcement, subbase, excavation, and code design are excluded.
- The footprint is rectangular.
- Truckloads are capacity references, not a dispatch plan.
Reference
Key terms
- Plan area
- Horizontal foundation footprint.
- Extra edge cross-section
- Thickened area beyond the uniform slab.
- Order volume
- Base geometry plus entered waste.
Important note
Calculated from the entered measurements and stated coverage or quantity rules. Confirm field dimensions, waste, product requirements, structural conditions, and local codes before purchasing or building.
Frequently asked questions
Why add only extra edge area?
The uniform slab already includes the slab portion beneath the edge.
Why round truckloads upward?
A fractional requirement needs capacity from another truck reference.
Does five truckloads mean five full trucks?
No. It is order volume divided by entered capacity, rounded up.
Is reinforcement included?
No. This page calculates concrete volume only.